GEPCO Online Application: Apply for New Connection 2024 (Step by Step Guide)
Searching for step by step guide on how you can apply for a GEPCO new connection in 2024 online? Your search stops here. We have got you covered.
In this blog post, we are going to guide you in detail about how you can apply online for a new GEPCO connection from the comfort of your home and without standing in long queues. So, let’s start.
Most of the users do not know what is the process of the GEPCO online application form for new connections? What are the required documents that you should keep before applying online? How to fill the form for a new connection? and so on! In today blog, we’ll try to cover your all the questions step by step.
GEPCO New Connection Online Application Process
Here is the step by step guide about how to apply for a GEPCO connection online through application form. You can also do it manually by visiting the nearest GEPCO Office physically, or now a day the most easiest way is online apply.
As technology is growing day by day so, everything is going online. By seeing the advancements in technology, GEPCO has also introduced an online e-portal for a new connection online.
You can now request a new connection from the comfort of your home, thanks to the GEPCO online application system. Applying for a new connection has never been easier saving you time and effort.
For domestic users there are two types of connections available:
Single-phase (under 15 kW or 15,000 watts) and three-phase (above 15 kW).
If you reside in a small house or have minimal home appliance usage a single-phase connection is suitable for you.
However, if your electricity consumption is high opting for a three-phase connection is recommended.
Also Read: GEPCO Bill Online
GEPCO New Connection Process 2024 (Manual)
You can get a new GEPCO connection through two different methods. The traditional method is a manual physical method that involves visiting the sub-divisional office in person. Alternatively, you can also use the GEPCO online application portal website for applying a GEPCO new connection from the comfort of your home. No wait, No queue.
The manual method requires a visit to the nearest GEPCO office. and you’ll need to complete a new connection form, ensuring all required information is provided accurately, and all the required documents have been attached in the file as well.
Required Documents:
The next step is to collect all the required documents that includes different things listed below,
➠ 1 Copy of Original CNIC (Computerized National Identity Card) or valid proof of identity issued by the Government.
➠ NOC (No Objection Certificate) from the relevant authorities, if required as per application form.
➠ Proof of property Ownership, (e.g., property documents, in case of rental property, you can attach rental agreement).
➠ Load demand calculations and relevant technical information, if required.
Submitting the Application:
The next step is to submit the filled application form so, that the relevant authorities can verify your data and start the new connection installation process. Once the submitted application is approved, you will be notified via phone, mail or sms and then you can pay the FEE or demand notice (Fee, Charges).
GEPCO Online Application For New Connection
Recently, the GEPCO has just introduced an e-portal and you can apply for a new GEPCO connection using the online portal. The process is quite simple and the requirements are also almost same and you can apply within minutes after signing up a new connection application.
Online Application Requirements:
To ensure a successful application submission and approval, gather the following documents:
➠ A copy of the property ownership document.
➠ An attested copy of the witness’s ID card.
➠ An attested copy of your ID card.
➠ A copy of your neighbor’s GEPCO bill.
➠ A wiring test report.
GEPCO Demand Notice Details
Once you successfully submit the application to GEPCO. Then, your application along with all the details that you submitted will be reviewed by the GEPCO officials and after approval of your new connection application by GEPCO, you will receive a Demand Notice.
This notice contains the fee required for the installation of the new connection. The approx. amount of the GEPCO Demand Notice ranges from 9000 to 12,000 PKR, as per GEPCO official details.
Once you submit the payment, GEPCO will proceed to install an electricity meter along with a 40-meter wire. If your house is situated far from the electric point you’ll need to pay additional charges for the extra wire.
Electricity New Connection (ENC) System
After gathering all the required documents in hand, the next step is to open or visit the ENC official website so, that you can start the application process.
Here is the link: ENC Office Site
First step is to simply visit ENC’s Official website.
As you’ll visit the ENC site, you’ll see various options such as Track, Apply, Change, Print Form, etc.
In the next step, Simply Click on the “Apply” option to start your application for a new GEPCO connection. This will lead you to a form where you’ll be advised to provide information about your Sub-Division.
Next Step – Choose the category type and a new form will appear below.
Fill in this form with details about your connection type, applicant information, contact person details, property description, and attach all necessary documents.
Attach the following scanned documents in JPEG format:
➠ Copy of Property Document
➠ Attested CNIC Copy of the Applicant
➠ Attested CNIC Copy of the Witness
➠ Copy of the Neighbor’s Electricity Bill
➠ Wiring Contractor’s Test Report
After attaching all the required documents simply, check the “I Agree” box and proceed by clicking the “Submit” button to complete your application.
Final Words:
After following the step by step details mentioned above, you can easily apply for a new GEPCO connection from the comfort of your home and without paying anything to anyone, as this is completely free. So, read the details explained above, gather the requirements and start applying for your GEPCO connection today!
Frequently Asked Questions (FAQs)
What is the GEPCO Online Application for New Connection?
The GEPCO Online Application for New Connection is a platform offered by GEPCO that allows new customers to apply for a new electricity connection from GEPCO (Gujranwala Electric Power Company) through an online portal.
Who can apply for a new connection through the GEPCO Online Application?
Any person or entity seeking a new electricity connection within the GEPCO designated service area can apply through online portal.
What are the advantages of applying online for a new connection?
Applying online makes the application process smoother and easy and also, it saves time and effort. It also eliminates the need for physical visits to GEPCO offices.
What documents are required for the online application?
The required documents usually include a copy of the property document, attested CNIC copies of the applicant and witness, copy of the neighbor’s electricity bill, and a wiring contractor’s test report.
How can I track the status of my application?
Applicants can track the status of their online application through the portal by logging in with their credentials.
What happens after my online application is approved?
Once your online application is approved GEPCO will issue a Demand Notice detailing the installation fee. Upon payment GEPCO will proceed with the installation of the electricity meter and wiring.
Is there a fee for submitting an online application?
There may be a nominal processing fee associated with submitting an online application, which is typically mentioned on the portal.
Can I apply for multiple connections through a single online application?
No, each new connection requires a separate online application.
What should I do if I encounter technical issues while filling out the online application?
If you encounter technical issues, you can reach out to GEPCO’s customer support for assistance.
Is there a deadline for submitting the online application?
There may not be a specific deadline for submitting the online application but it’s advisable to apply as soon as possible to avoid delays in the processing of your request.